Page 1
• Installation work must be performed in accordance with the national wiring standards by authorized personnel only. • Please retain this installation manual for future reference after reading it thoroughly. TYPE : HIGH EFFICIENCY INVERTER MODEL : AUUW126DH1 [UU12WH] AUUW186DH1 [UU18WH] AUUW216DH1 [UU21WH] www.lg.com...
Page 2
TIPS FOR SAVING ENERGY TIPS FOR SAVING ENERGY Here are some tips that will help you minimize the power consumption when you use the air conditioner. You can use your air conditioner more efficiently by referring to the instructions below: •...
Page 3
IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE USING THE APPLIANCE. Always comply with the following precautions to avoid dangerous situations and ensure peak performance of your product WARNING It can result in serious injury or death when the directions are ignored CAUTION It can result in minor injury or product damage when the directions are ignored WARNING...
Page 4
IMPORTANT SAFETY INSTRUCTIONS • Do not install the product on a defective installation stand. - It may cause injury, accident, or damage to the product. • Be sure the installation area does not deteriorate with age. - If the base collapses, the air conditioner could fall with it, causing property damage, product failure, and personal injury.
TABLE OF CONTENTS TABLE OF CONTENTS INSTALLATION PLACES TEST RUNNING Outdoor unit Piping length and the elevation NIGHT SILENT OPERA- TION SETTING THE OUTDOOR UNIT SELF-DIAGNOSIS FUNC- INSTALLATION TION Connecting the cable to Outdoor Unit Error Indicator (Outdoor) CONNECTING PIPES INSTALLATION GUIDE Preparation of Piping AT THE SEASIDE...
INSTALLATION PLACES INSTALLATION PLACES Outdoor unit - If an awning is built over the unit to prevent direct sunlight or rain exposure, make sure that heat radiation from the condenser is not restricted. More than - Ensure that the spaces indicated by arrows around front, back and side of the unit.
THE OUTDOOR UNIT INSTALLATION THE OUTDOOR UNIT INSTALLATION Connecting the cable to Out- Power cord Connecting terminal door Unit cable terminal - Remove the side panel or cover control for wiring connection. - Use the cord clamp to fix the cord. - Earthing work •...
Page 8
THE OUTDOOR UNIT INSTALLATION - The installation piping is connectable in 3 di- rections.(refer to figure 1) <Figure 1> Backward Sideways Forward Preventing foreign objects from entering (refer to figure 2) - Plug the pipe through-holes with putty or in- sulation material(procured locally)to stop up all gaps,as shown in the figure 2.
CONNECTING PIPES CONNECTING PIPES Preparation of Piping Flaring work - Carry out flaring work using dedicated flaring Main cause of gas leakage is defect in flaring tool for R410A as shown below. work. Carry out correct flaring work in the fol- lowing procedure.
CONNECTING PIPES Connecting the pipings to the Connecting the pipes to the indoor unit and drain hose to Outdoor unit drain pipe - Align the center of the piping and sufficiently tighten the flare nut by hand. - Align the center of the pipings and suffi- ciently tighten the flare nut by hand.
CONNECTING PIPES Forming the piping In cases where the outdoor unit is installed Form the piping by wrapping the connecting above the indoor unit perform the following. portion of the indoor unit with insulation mate- Tape the piping and connecting cable from rial and secure it with two kinds of vinyl tape.
LEAKAGE TEST AND EVACUATION LEAKAGE TEST AND EVACUATION Air and moisture remaining in the refrigerant CAUTION system have undesirable effects as indicated below. To avoid nitrogen entering the refrigerant Pressure in the system rises. system in a liquid state, the top of the cylinder must be higher than its bottom Operating current rises.
LEAKAGE TEST AND EVACUATION Evacuation Connect the charge hose end described in the preceding steps to the vacuum pump to evacuate the tubing and indoor unit. Confirm the "Lo and Hi" knob of the mani- fold valve is open. Then, run the vacuum pump.
WIRING CONNECTION WIRING CONNECTION Precautions when laying power wiring Use round pressure terminals for connections to the power terminal block. Electrical Wiring Perform the electrical wiring work according Power wire Round pressure terminal to the electrical wiring connection. - All wiring must comply with local require- ments.
TEST RUNNING TEST RUNNING 1 Precautions in test running * Is there any faulty wiring? - The initial power supply must provide at * Are not terminal screws loosened? least 90% of the rated voltage. M4..118N.cm{12kgf.cm} Otherwise, the air conditioner should not M5..196N.cm{20kgf.cm} be operated.
Page 16
TEST RUNNING CAUTION After the confirmation of the above conditions, prepare the wiring as follows: 1) Never fail to have an individual power specialized for the air conditioner. As for the method of wiring, be guided by the circuit diagram pasted on the inside of control box cover.
NIGHT SILENT OPERATION SETTING NIGHT SILENT OPERATION SETTING 1 Open the panel of outdoor unit. 2 Set the DIP SW01N as below Fig. DIP SW01N DIP Switch2 Function Night Silent Operation - Night Silent Operation - 3 Close the panel...
SELF-DIAGNOSIS FUNCTION SELF-DIAGNOSIS FUNCTION Error Indicator (Outdoor) Outdoor Error Ex) Error 21 (DC Peak) 2 Times 2 Times 2 Times LED01G (RED) 1 Sec. 1 Sec. 1 Sec. 1 Time 1 Time 1 Time LED02G (GREEN) 2 Sec. 2 Sec. Erro Code Description LED 1(Red)
INSTALLATION GUIDE AT THE SEASIDE INSTALLATION GUIDE AT THE SEASIDE CAUTION In case, to install the outdoor unit on the seaside, set up a windbreak not to be ex- posed to the sea wind. • Air conditioners should not be installed in areas where corrosive gases, such as acid or alkaline gas, are produced.