Page 1
H9A11 Cabinet Installation/Owner's Guide Part Number: EK-H9A11-IN. B01 June 1999 Compaq Computer Corporation Houston, Texas...
Page 2
Compaq and the Compaq logo are registered in United States Patent and Trademark Office. Other product names mentioned herein may be trademarks and/or registered trademarks of their respective...
Preface Overview ... v Intended Audience ... v How to Use This Guide ... v Organization ... vi Conventions ...vi Safety Symbol... vi Reader's Comments...vii 1 Introduction 1.1 Description... 1–1 1.2 Specifications ... 1–3 2 Installation 2.1 Introduction... 2–1 2.2 Tools Required... 2–1 2.3 Site Planning ...
Page 4
Figures Figure 1-1 H9A11 Cabinet ... 1–2 Figure 2-1 Unpacking the Cabinet ... 2–4 Figure 2-2 Installing the Ramps... 2–6 Figure 2-3 Deskidding the Cabinet ... 2–8 Figure 2-4 Removing and Replacing the Rear Lift-Off Door ... 2–11 Figure 2-5 Removing and Replacing the Front Filler Panels... 2–13 Figure 2-6 Pulling Out and Adjusting the Stabilizer Bar...
Before installation, review the warranty. The terms of the warranty agreement with Compaq may require that a qualified Compaq Customer Service representative install the system.
Organization This guide is organized as follows: Chapter 1, Introduction -- Provides an overview of the H9A11 Cabinet features and specifications. Chapter 2, Installation -- Provides site preparation, unpacking, and installation information. Appendix A, Field Replaceable Units (FRUs) -- Provides a list of the field replaceable units (FRUs) for the H9A11 Cabinet.
Reader's Comments Compaq welcomes your comments on this or any other manual. You can send your comments to Compaq in the following ways: Internet electronic mail: reader-comments@digital.com Mail: Compaq Computer Corporation Information Design PKO3-2/21J 129 Parker Street Maynard, MA 01754-2199...
1.1 Description The H9A11 Cabinet (Figure 1-1) is a low-cost, computer-equipment enclosure system that meets the Electronic Industries Association (EIA) standard 310C and the International Electrotechnical Commission (IEC) 297 standards and can accommodate fixed or slide- mounted chassis that fit into a standard 48.26-cm (19-in.) rack. The cabinet has the following factory installed features: Equipment mounting rails with the EIA universal rail-hole pattern Front trim kit that provides a finished look to the front opening of the cabinet...
Introduction 1.2 Specifications Specifications for the H9A11 Cabinet are as follows: Physical Height, overall Width, overall Depth, overall Maximum vertical rackmounting space Maximum vertical rackmounting space (with power distribution unit installed)\ Horizontal rack width Weight - Cabinet with power distribution unit - Cabinet with power distribution unit plus packing material - Fully configured (filled) cabinet...
Page 12
Introduction Power cord (attached) 1–4 H9A11 Cabinet Installation/Owner’s Guide H7600-AA - 120 Vac with L5-30P connector H7600-AB - 240 Vac with L6-20P connector H7600-DB - 240 Vac with IEC 309 connector...
2.1 Introduction This chapter provides the following information: Tools Required (Section 2.2) Site Planning (Section 2.3) Unpacking (Section 2.4) Installation Procedures (Section 2.5) 2.2 Tools Required The tools needed to install the H9A11 Cabinet are: Utility knife Phillips screwdriver 5/8-inch box wrench or adjustable wrench 2.3 Site Planning The cabinet requires a space of 60.0 cm (23.60 in.) by 86.0 cm (33.86 in.).
Page 14
Installation _______________________ WARNING __________________________ High Leakage Current --- An insulated earthing conductor that is identical in size, insulation material, and thickness to the earthed and unearthed branch- circuit supply conductors (except that it is green with or without one or more yellow stripes) is to be installed as part of the branch circuit that supplies the unit or system.
____________________________________________________________ 4. Remove the plastic bag 5. Check the cabinet and the associated equipment for any external damage. Report any damage to Compaq Customer Service or a Compaq sales office and to the responsible freight carrier. __________________________ Note _____________________________ Keep all packing material and receipts in case a damage claim is filed.
Page 17
6. Refer to Figure 2-2. Remove the four shipping bolts four cabinet leveler feet to the pallet __________________________ Note _____________________________ The ramps attach to the front of the pallet. Therefore, the cabinet will have to be rolled frontwards down the ramps. ____________________________________________________________ ¡...
Page 19
________________________WARNING __________________________ In the following step, use sufficient personnel to move the cabinet off the pallet. The cabinet weighs 80.74 kg (178 lb) empty, and can weigh up to 420.94 kg (928 lb) fully configured. If equipment is installed in the cabinet, the cabinet may become top heavy and could accelerate rapidly down the ramps if not restrained.
2.5 Installation Procedures During the installation of the cabinet, one or more of the following procedures may be needed: Removing and Replacing the Rear Lift-Off Door (Section 2.5.1) Removing and Replacing the Front Filler Panels (Section 2.5.2) Pulling Out and Adjusting the Stabilizer Bar (Section 2.5.3) Removing and Replacing the Power Distribution Unit (Section 2.5.4) Installation H9A11 Cabinet Installation/Owner's Guide 2–9...
Installation 2.5.1 Removing and Replacing the Rear Lift-Off Door The rear lift-off door provides access into the rear of the cabinet. To remove the rear lift-off door, refer to Figure 2-4 and proceed as follows: Removal 1. Remove the two Phillips-head screws ...
Page 23
Installation Figure 2-4 Removing and Replacing the Rear Lift-Off Door MA IN POW ER LJ-04807 H9A11 Cabinet Installation/Owner's Guide 2–11...
Installation 2.5.2 Removing and Replacing the Front Filler Pa nels To remove a front filler panel, refer to Figure 2-5 and proceed as follows: Removal Grasp the front filler panel cabinet. Replacement To replace a front filler panel exploded view) with the appropriate ball studs place.
Page 25
Figure 2-5 Removing and Replacing the Front Filler Panels Installation scale=.12 scale=.9 LJ-04808 H9A11 Cabinet Installation/Owner's Guide 2–13...
Installation 2.5.3 Pulling Out and Adjusting the Stabilizer Bar The stabilizer bar pulls straight out from the bottom front of the cabinet Figure 2-6. When the stabilizer bar is fully extended, adjust the foot stabilizer bar until it touches the floor. _______________________ WARNING __________________________ The stabilizer bar must be fully extended before any system is extended out of the cabinet on its slides.
Page 27
Installation Figure 2-6 Pulling Out and Adjusting the Stabilizer Bar Scale=.12 then .72 LJ-04809 H9A11 Cabinet Installation/Owner's Guide 2–15...
Installation 2.5.4 Removing and Replacing the Power Distribu tion Unit _______________________ WARNING __________________________ There can be one or more PDUs per cabinet. Ensure that all systems installed in the cabinet are turned off as described in the system documentation before performing the following procedure.
Page 29
Installation Figure 2-7 Removing and Replacing the Power Distribution Unit M A IN P O W E MA IN PO WE LJ-04810 H9A11 Cabinet Installation/Owner's Guide 2–17...
Page 31
Field Replaceable Units (FRUs) Table A-1 lists the field replaceable units (FRUs) for the H9A11 cabinet. Table A-1 Field Replaceable Units (FRUs) Description Power distribution unit, 100 to 120 Vac Power distribution unit, 200 to 240 Vac Power distribution unit, 200 to 240 Vac Part Number H7600-AA H7600-AB...