hit counter code

Layout Plan In Control Box; Screw Tightening Torque - Fujitsu Airstage VR-II Series Service Manual

Table of Contents

Advertisement

4. Layout plan in CONTROL BOX

Magnetic Relay
(Rush current protection)
Filter PCB
Secondary
(3 phase)
Diode Bridge
Coil
Filter PCB
(1 phase)
Filter PCB
Primary
(3 phase)
Terminal

5. Screw tightening torque

.
2.4 +0.1N m
-
.
2.4 +0.1N m
-
.
5.0 ~7.0N m
Resistor, cement
(Rush current protection)
Main PCB
Communication PCB
There is danger to which a fire and the capacitor explosion break out in
DANGER
the market if it does not assemble it with a regulated torque.
2.4 +0.1N m
-
.
.
0.5 ~0.6N m
06-03
Resistor, cement
(Discharge from capacitor)
Terminal
.
2.4 +0.1N m
-
DANGER
Orientation of the capacitor,
Please be installed in the left side
and the (-) side always.
Reactor
Fan driver PCB
Inverter PCB
Phase CT PCB
.
2.4 +0.1N m
-
.
1.5 +0.1N m
-
.
2.4 +0.1N m
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents