Site Preparation Time Allowances - HP XP20000/XP24000 Manual

Hp storageworks xp24000/xp20000 disk array site preparation guide (ae002-96055, september 2010)
Hide thumbs Also See for XP20000/XP24000:
Table of Contents

Advertisement

*
Checklist questions
Have all sources of electrical interferences been
*
corrected?
Does the customer site have access control (for
example, will HP representatives need an es-
cort)?
Does the computer room have access control
(for example, will HP representatives need a
security code)?
Are all floors, stairs, elevators, stairwalkers, lifts,
*
ramps, or ladders needed to move the equip-
ment adequate to support its weight and size?
Will the equipment fit through all doors and
*
corridors and in lifts?
Does the building have a loading dock? Maxim-
*
um access height is _____m.
For any additional equipment required (for ex-
ample, connectors, receptacles, cables, and any
equipment not supplied by HP), is the equipment
on site and ready for use?

Site preparation time allowances

The following tasks may require several weeks:
Acquiring required power connectors
Arranging for an electrician
Adding or modifying air conditioning systems
Making building alterations
Placing an order for data communication equipment, including equipment required to support the
Internet-based remote support option.
The time between placing an equipment order and actual delivery can vary. Contact your HP
representative to determine the best estimated delivery dates.
12
Site preparation team and tasks
Yes
No
Reference
Sources of electrical
NA
NA
Delivery space
Delivery space
NA
NA
interference, page 43
requirements, page 21
requirements, page 21